Afterwards, the boiler water needs to be sampled and analyzed. After confirming that the water quality meets the standard, suspend flushing, and close the drainage and sewage valves. Slowly send water to the biomass steam generator to make the liquid level control meet the requirements. Each ash door and each furnace door should also be properly opened before baking, so as to remove the moisture in the furnace as soon as possible.
The front half of the biomass steam generator oven is the end of the wood oven. After the end, it can be baked in the oven according to the standard. At this time, the opening of the blower should be increased, the induced draft fan should be slightly opened, the furnace door and ash door should be closed, and the smoke temperature should be raised in an all-round way. , to achieve the effect of drying the furnace wall.
During the whole operation process, care should be taken not to use strong fire for baking, and the temperature rise should be slow and uniform; at the same time, the water level of the biomass steam generator should be checked regularly to keep it within the normal range; the combustion flame in the furnace body should be uniform. cannot exist in one place.
Not only that, the blowdown valve can be properly opened during the drying process of the biomass steam generator to ensure the water level of the biomass steam generator. At the same time, the gas temperature should be recorded regularly, and the heating rate and maximum temperature should be controlled so as not to exceed the requirements. In such an environment, the biomass steam generator will have good oven quality.