In the production process of architectural coatings, the temperature requirements are relatively high. When heating the reactor, it needs to reach the specified temperature, so that the quality of the produced coatings and other aspects will be more favored by consumers.
The Nobeth steam generator can be operated with one button, and the temperature and pressure can be easily controlled without special supervision, which makes heating in industrial production easier and saves worry and effort. At the same time, Nobeth steam generators produce steam quickly, high-temperature steam can be generated in 3-5 minutes, and the steam volume is sufficient to fully meet production needs.
A building material manufacturer in Hubei cooperated with Nobeth and purchased a Nobeth AH series 120kw electric heating steam generator for use with a reactor. There are 3 reactors on site, one with 5 tons, one with 2.5 tons and one with 2 tons. It is used for 3-4 hours a day, up to 6 hours, and a reactor is usually used for 5 tons or 2.5 tons at a time. Burn 2.5 tons first, then burn 5 tons. The temperature is around 110-120 degrees. Customers reported on-site feedback that the equipment is good, clean and environmentally friendly, and easy to operate. In addition, Noves goes to the company to overhaul the equipment almost every year in the “After-sales Service Miles” activity, discovers problems in time and actively handles them, prolonging the service life of the equipment, which is widely praised by customers.